Capabilities

ORRO Manufacturing Co., Ltd. combines CNC machining, molding and finishing under one roof to turn engineering plastics, rubber, composites, graphite and ceramics into precision parts. From single prototypes to production runs, we match the process to the material and the geometry — so you get the right method, not just the one we happen to run.

How We Choose a Process

Material, tolerance, geometry and volume decide the method. Simple prismatic parts are milled; rotational parts are turned; small complex parts go to 5-axis or Swiss machining; high volumes move to molding. We advise on the most cost-effective route before quoting.

Capability Matrix

Process Best for Typical tolerance Economical volume Typical lead time
CNC milling Prismatic parts, pockets, profiles ±0.02 mm 1 – 5,000 pcs 2 – 3 weeks
CNC turning Shafts, bushings, rings, fittings ±0.01 mm 1 – 10,000 pcs 2 – 3 weeks
5-axis machining Contoured and undercut geometry ±0.01 mm 1 – 2,000 pcs 3 – 4 weeks
Swiss machining Small precision parts under 20 mm ±0.005 mm 500 – 100,000 pcs 2 – 3 weeks
Injection molding High-volume plastic parts ±0.05 mm 2,000+ pcs 4 – 6 weeks
Laser cutting Flat gaskets, shims, pads ±0.1 mm 1 – 50,000 pcs 3 – 7 days
Rubber / silicone molding Seals, gaskets, over-molds ISO 3302 1,000+ pcs 4 – 6 weeks
PU casting Rollers, scrapers, wear pads ±0.1 mm 10 – 5,000 pcs 2 – 4 weeks

One Partner, Full Chain

We handle material selection, prototyping, production, inspection and finishing in a single workflow — with English-speaking project management and traceability from raw material batch to finished part.

Case Studies

Multi-process automation kit — a European automation builder needed a mixed kit of POM gears (machined, 50 pcs), PEEK bushings (Swiss-turned, 2,000 pcs) and silicone gaskets (molded, 5,000 pcs). We split the order across three processes, ran them under one project number and shipped a single consolidated delivery in 4 weeks, with dimensional reports for each batch.

Pump rebuild kit, mixed materials — a chemical-pump service company needed 800 replacement parts across PTFE gaskets (laser-cut), PEEK wear rings (turned) and EPDM seals (molded). We ran all three processes under one inspection plan and shipped a single kit in 3 weeks, bagged and labelled per pump model.

Request a Quote