Injection Molding

ORRO Manufacturing Co., Ltd. supplies custom injection molding for plastic and rubber parts when volume makes machining uneconomical. We tool and mold parts in POM, Nylon, PEEK, PP, PE and elastomers, matching gate and cooling design to the material so parts come out dimensionally stable and ready to assemble.

Materials We Mold

  • POM (Delrin) — gears, cams, housings and precision parts
  • Nylon (PA6/PA66) — tough structural parts and wear components
  • PEEK — high-temperature and medical-grade parts
  • PP, PE, ABS, PC — general and technical plastic parts
  • Rubber and silicone — seals, gaskets and over-molded components

Specifications

  • Tolerance: ±0.05 mm typical; tighter on critical features after tool qualification
  • Tooling: prototype and production molds
  • Volume: economical from a few thousand pieces upward
  • Surface finish: SPI grades as specified
  • Lead time: tooling 3–5 weeks, then production runs

Process Parameters

Parameter Typical value
Melt temperature 200 – 400 °C (material dependent)
Mold temperature 60 – 180 °C
Injection pressure 800 – 1,500 bar
Holding pressure 50 – 70% of injection pressure
Cycle time 15 – 60 s
Clamp force 50 – 250 t
Achievable tolerance ±0.05 mm; tighter after tool qualification
Tooling P20 / hardened steel, 1 – 16 cavities
Draft angle 1 – 2° typical

Applications

  • Gears and cams — high-volume drive components
  • Housings and covers — enclosures and structural parts
  • Seals and gaskets — molded elastomer sealing parts
  • Over-molded parts — rubber bonded to plastic or metal inserts

Case Studies

POM gears, 24-tooth, 8-cavity tool — an automation customer needed 24-tooth POM gears at ±0.05 mm in volume. We built an 8-cavity mold running a 30 s cycle, qualified the tool in 4 weeks and produced 50,000 gears per month, with first-article and periodic dimensional reports.

PEEK sealing rings, 4-cavity hot-runner tool — a semiconductor customer needed high-purity PEEK sealing rings at ±0.03 mm. We ran a 4-cavity hot-runner mold on a 45 s cycle, qualified the tool in 5 weeks and supplied 20,000 rings with full material traceability.

Request a Quote