Polyurethane Processing

ORRO Manufacturing Co., Ltd. processes polyurethane into wear-resistant components that combine the toughness of rubber with the load capacity of plastic. We cast and machine PU from 60A to 95A shore, and bond it to metal cores, to produce scraper blades, roller sleeves, wheels and impact pads.

Materials We Process

  • Cast PU (60A–80A) — flexible, high-grip rollers and wheels
  • Cast PU (85A–95A) — hard, load-bearing pads and sleeves
  • MDI and TDI systems — for hydrolysis and abrasion resistance
  • Metal-bonded PU — polyurethane bonded to steel or aluminium cores
  • PU sheet and rod — machined into custom profiles

Specifications

  • Hardness: 60A to 95A shore, custom blends available
  • Tolerance: ±0.1 mm typical on machined PU
  • Bonding: PU to metal with chemical primer
  • Max size: rollers and sleeves up to 500 mm
  • Lead time: 2–4 weeks depending on casting

Process Parameters

Parameter Typical value
Casting temperature 80 – 110 °C
Mix ratio Per system (prepolymer / curer)
Cure time 16 – 24 h at room temperature
Post-cure 100 °C for 8 – 16 h
Hardness 60A – 95A shore
Bonding primer Chemical primer, metal surface prepared
Achievable tolerance ±0.1 mm on machined PU
Demold time 30 – 60 min in the mold

Applications

  • Scraper blades and squeegees — flexible wiping and doctoring elements
  • Roller sleeves and wheels — conveyor, packaging and drive rollers
  • Wear pads and bumpers — impact and abrasion protection
  • Seals and gaskets — flexible, tear-resistant sealing parts

Case Studies

85A PU roller sleeves on steel cores — a packaging line needed 60 roller sleeves in 85A polyurethane, bonded to steel cores and ground to ±0.1 mm on the OD. We cast the PU against primed cores, post-cured them, then ground the running surface true. Delivered in 3 weeks with hardness and bond checks.

PU scraper blades, 90A, steel-backed — a conveyor OEM needed 400 scraper blades in 90A PU bonded to steel backing strips and ground to a straight edge. We cast against primed strips, post-cured and finish-ground them; delivered in 3 weeks with hardness and bond checks.

Request a Quote